• Khyber Pakhtunkhwa Hydropower & Renewable Energy Development (Madyan Hydropower Project, MHPP), Peshwar Pakistan, 2023
  • Floating Solar in Pakistan Project (300MW), Pakistan, 2023 (Individual)
  • Preparation of Environmental & Social (E&S) Documents under the World Bank’s Environmental and Social Framework (ESF) for Jamuna River Stabilization Program, Bangladesh, 2020
  • Volcanic Eruption Emergency Project, St. Vincent and the Grenadines, 2022 (Individual)
  • Environment, Natural Resources and Blue Economy Global Practice, Caribbean Islands (Jamaica, St. Vincent and the Grenadines, and Guyana), 2021 (Individual)
  • Independent ESIA for CASA-1000 Pakistan HVDC Transmission Line Project, Pakistan, 2021 (Individual)
  • WAT-D-18: Health and Safety Standards for Hydropower Projects, Pakistan, 2022
  • Independent ESIA for 765 kV Dasu Transmission Line Project, Pakistan, 2019 (Individual)
  • Detailed Feasibility study including Geotechnical Investigation, Environmental Impact Assessment (EIA), Social Impact Assessment (SIA) & Disaster Impact Assessment (DIA) Study of Proposed 2 x 600 MW (or above) in first phase and 2 x 600 MW (or above) in second phase Ultra-Supercritical (USC) Coal Fired Power Plant at Pekua, Cox’s Bazar, April-September, 2018.
  • ESIA for Coal Transportation, Dredging Operation, Morphological Aspect, Jetty and Breakwater Construction for 2X660 MW Coal Based Thermal Power Plant Project.
  • Environmental and Social Management Framework (ESMF) for Power System Reliability and Efficiency Improvement Project.
  • Management Support Consultancy for Padma Multi-purpose Bridge Project.
  • Occupational Health and Safety in Dasu Hydropower Implementation Project, 2015-2027.
  • Independent Environmental Impact Assessment of Balochistan Integrated Water Resources Management and Development Project (Individual)
  • Environmental and Social Impact Assessment for Coal Transportation of 1,320MW Maitree Coal Fired Power Stations.
  • EIA for Ghorashal Thermal Power Plant Unit 4 Repowering to Combined Cycle, Bangladesh.
  • Independent Environment Review of the River Bank Improvement Project, Bangladesh (Individual)
  • Independent Validation and Updation of the existing Social and Environment Safeguard Documents as per Guidelines of World Bank prepared by the Guddu Barrage Rehabilitation Design Consultants, Pakistan (Individual)
  • Independent ESIA for Water Intake Works on Shire River, Water Treatment Works, Pump Stations, Pipelines and Reservoirs
  • World Bank funded South Asia Eastern Corridor Regional Transport and Trade Facilitation Project (Individual)
  • World Bank funded Environmental and Social Impact Assessment for Upgrading the Kidunda Dam and Access Road
  • IFC funded Environmental and Social Assessment of Almaty Ring Road Project
  • AfDB funded Operational Guidelines of Coal Fired Power Generation.